ALL ADVISORIES WINTER DRIVING ROAD WORK TRUCKING CAMERAS WEATHER MOUNTAIN PASSES
 511 or (888) 432-7623
   ABOUT/FAQs    WEB SITE HELP    PHONE HELP

 TRAVELER INFO
   AIRPORTS    HISTORIC MARKERS    PUBLIC
   TRANSPORTATION
   REST AREAS    RWIDS    SCENIC BYWAYS    TOURISM

 LINKS
   ADJACENT AREAS    AMBER ALERTS    BOISE METRO AREA
   TRAFFIC INFO
   NAT’L INTERAGENCY
   FIRE CTR
   NATIONAL
   WEATHER SERVICE
   WILDFIRE INFO
   (GEOMAC)
Visit Idaho
Idaho Parks & Rec
Idaho State Police
Garvee Transportation Program

 There is a closure or blockage reported on the following route: ID 6.
road closed to traffic, paving operations on SH 6 from Washington State Line to US Route 95 — until August 1 roadway reduced to one lane, bridge construction, width limit in effect, speed restrictions in force on Interstate 84 in both directions at The Oregon State Line — until October 31 shoulder closed, bridge maintenance operations, width limit in effect, roadway reduced to one lane, road maintenance operations on Interstate 15 in both directions from after Exit 71 - Interstate 15 Business to before Exit 72 - Interstate 86 — until July 19 speed restrictions in force, roadway reduced to one lane on Interstate 15 from Exit 143 - State Highway 33 to Exit 180 - Spenser Road because the road is being repaved delays, speed restrictions in force, roadway reduced to one lane, width limit in effect on US 20 from Iona Road to before Thornton Road due to road construction work -- look out for flaggers roadway reduced to one lane, speed restrictions in force, short delays on Interstate 90 westbound from Exit 15 - Sherman Avenue to The Washington State Line due to road construction work road construction, work in the median, speed restrictions in force, roadway reduced to one lane, right lane closed on Interstate 84 westbound from after Exit 50 - Overland Road to Exit 54 - Broadway Avenue -- look out for flaggers — until January 10, 2009 road construction, paving operations, delays, roadway reduced to one lane on Interstate 84B from Bitterbrush Court to South Third West -- look out for flaggers, detour in operation, consider using an alternate route — until July 30 roadway reduced to one lane, right lane closed, road construction, work in the median on SH 55 in both directions from Interstate 84 to State Highway 44 -- look out for flaggers — until September 1 paving operations, roadway reduced to one lane, speed restrictions in force, truck restrictions in force on US 20 in both directions from Cat Creek Summit to Tracy Lane -- pilot car in operation, look out for flaggers roadway reduced to one lane, road construction, paving operations, delays, speed restrictions in force on SH 51 from after Bureau of Indian Affairs Highway 211 to before Tindall Road -- look out for flaggers, pilot car in operation — until July 15 roadway reduced to one lane, road construction, speed restrictions in force on Interstate 84 in both directions from Exit 36 - Franklin Road to Exit 46 - Eagle Road — until July 30, 2010 roadway reduced to one lane, bridge construction, delays on Interstate 15 between Exit 31 - Downey Road and Exit 36 - Hawkins Road — until September 8 delays, speed restrictions in force, roadway reduced to one lane on US 20 from after State Highway 22; State Highway 33 to before Brunt Street because the road is being repaved -- look out for flaggers paving operations, single line traffic - alternating directions, roadway reduced to one lane, delays on US 30 in both directions from after 2000 South Road to River Road -- pilot car in operation, look out for flaggers — until July 22 speed restrictions in force, roadway reduced to one lane on US 26 from after US Route 26 Business in Ririe to before Birch Creek Road because the road is being repaved -- look out for flaggers — until July 8 bridge construction, roadway reduced to one lane, delays, width limit in effect on SH 97 in both directions at Blue Lake Road road construction, bridge construction, speed restrictions in force, right lane closed, work in the median, exit ramp closed on Interstate 84 at Exit 29 - Franklin Road -- detour in operation — until September 1 deer on the roadway on SH 13 from Wall Creek Road to US Route 12 deer on the roadway on US 12 from after Mill Street to before Swan Creek Road roadway reduced to two lanes, paving operations, road construction, bridge construction, height limit in effect, width limit in effect on SH 34 northbound from after US Route 30; Second Street South to Third East Street -- detour in operation roadway reduced to two lanes, road construction, width limit in effect on US 95 from Parma Road to East McConnell Avenue — until July 10 damage to bridge, truck restrictions in force on Interstate 86 eastbound at Exit 40 - Interstate 86 Business delays, speed restrictions in force, width limit in effect on SH 75 from after Sullivan Hot Springs Road to before East Fork Road due to bridge construction work -- look out for flaggers parade on SH 13 from C Street to before Poor Farm Road — until Saturday, at about 4:00 PM Mountain Time delays, speed restrictions in force, bridge construction, road construction, width limit in effect on US 89 in both directions from Home Canyon Road to before Crow Creek Road -- look out for flaggers bridge construction, work in the median, shoulder closed on Interstate 15 northbound from after Exit 67 - Interstate 15 Business to before Exit 71 - Interstate 15 Business bridge construction, width limit in effect on SH 97 in both directions between Flicker Lane and Burma Road work in the median on US 95 from after 41st Street North to 36th Street North — until July 21 bridge maintenance operations on SH 34 between Cleveland Road and Maple Grove Road — until November 18 sports event on SH 13 from C Street to before Poor Farm Road — until Saturday, at about 11:00 AM Mountain Time speed restrictions in force, width limit in effect, road construction on US 30 in both directions from after Crystal Springs Road to before Center Street West — until November 30 bridge construction, work in the median on Interstate 15 southbound from after Exit 67 - Interstate 15 Business to before Exit 71 - Interstate 15 Business because the shoulder is closed to traffic rest area closed on Interstate 84 at The Snake River View Rest Area — until July 15 rest area closed on US 26 at The Clark Hill Rest Area long term road construction, speed restrictions in force, bridge construction, delays on US 95 in both directions from Fourth Street to Setters Road -- look out for flaggers — until November 1 open on Interstate 15 northbound at The Cherry Creek Rest Area
Zoom into Boise
Zoom into Coeur D'Alene
Zoom into INL
 
The list below contains all current reports for the state of Idaho.
ID 1
US 2
ID 3
ID 4
ID 5
ID 6
SH
SH 6: from Washington State Line to US Route 95
road closed to traffic, paving operations — until August 1
Comment: The road will be closed to traffic from June 9, 2008 to around August 1, 2008. During the road closure from Milepost 100 (Palouse, Washington) to Milepost 104.42 (Potlatch, Idaho), traffic will be routed to Idaho 66, a detour of about a mile. The route will be posted. Traffic Controller is North Star Enterprises, Inc., Amelia Baker (509) 891-0892. Contractor is Scarsella Brothers, Inc., John Cooper, 285-1070.

last updated yesterday at 11:24 AM Mountain Time
 
ID 7
ID 8
ID 9
ID 11
US 12
US
US 12: from after Mill Street to before Swan Creek Road
deer on the roadway
Comment: From dusk to dawn, watch for deer on the roadway from milepost 68 (one mile east of Kamiah) to milepost 87 (two miles west of Syringa).

last updated June 30
 
ID 13
SH
SH 13: from C Street to before Poor Farm Road
parade — until Saturday, at about 4:00 PM Mountain Time
Comment: Grangeville Border Days celebration July 3rd, 4th, & 5th. Kiddie Parade at 12:30 on July 4th, another parade from about 1:00 to 3:00 p.m. July 3rd and again on July 5th. A detour route will be in place.

last updated June 18
 
SH
SH 13: from C Street to before Poor Farm Road
sports event — until Saturday, at about 11:00 AM Mountain Time
Comment: Grangeville Border Days Street Sports from 9:00 a.m. to 10:00 a.m. SH-13, July 3rd, 4th, & 5th. There will be a detour in place.

last updated June 18
 
SH
SH 13: from Wall Creek Road to US Route 12
deer on the roadway
Comment: From dusk to dawn, watch for deer on the roadway from milepost 11 (ten miles east of Grangeville) to milepost 26.39 (near Kooskia).

last updated June 30
 
ID 14
I-15
Interstate
Interstate 15 northbound: at The Cherry Creek Rest Area
open
Comment: The Cherry Creek Rest Area, located on I-15 at milepost 7.0 Northbound is now open. Contractor is working on landscaping, sprinkler system, and caretaker's home.

last updated today at 5:14 PM Mountain Time
 
Interstate
Interstate 15: between Exit 31 - Downey Road and Exit 36 - Hawkins Road
roadway reduced to one lane, bridge construction, delays. Expect 15 - minute delays. — until September 8
Comment: This bridge construction project is on I-15 at milepost 34. Work is being done on the Virginia Interchange Bridge. Fifteen minute delays on the bridge in both directions, east and westbound, are expected. Motorists should use caution around crews and equipment.

last updated today at 5:14 PM Mountain Time
 
Interstate
Interstate 15 northbound: from after Exit 67 - Interstate 15 Business to before Exit 71 - Interstate 15 Business
bridge construction, work in the median, shoulder closed daily
Comment: This Clark Street Overpass project is on I-15 between mileposts 68.5 and 70.2 in Pocatello. Both northbound and southbound lanes across the bridge decks are open. Landscaping and seeding will be done as weather permits so motorists should expect intermittent lane and shoulder closures both southbound and northbound across the Clark Street Interchange structure. Crews and equipment are still entering and exiting the roadway, as weather permits. Motorists should use extreme caution in the construction area.

last updated today at 5:14 PM Mountain Time
 
Interstate
Interstate 15 southbound: from after Exit 67 - Interstate 15 Business to before Exit 71 - Interstate 15 Business
bridge construction, work in the median because the shoulder is closed to traffic daily
Comment: This Clark Street Overpass project is on I-15 between mileposts 68.5 and 70.2 in Pocatello. Both northbound and southbound lanes across the bridge decks are open. Landscaping and seeding will be done as weather permits, so motorists should expect intermittent lane and shoulder closures both northbound and southbound across the Clark Street Interchange structure. Crews and equipment are still entering and exiting the roadway, as weather permits. Motorists should use extreme caution in the construction area.

last updated today at 5:14 PM Mountain Time
 
Interstate
Interstate 15 in both directions: from after Exit 71 - Interstate 15 Business to before Exit 72 - Interstate 86
shoulder closed, bridge maintenance operations, width limit in effect, roadway reduced to one lane, road maintenance operations Width limit 11 ' 0 " — until July 19
Comment: WORK ON THIS PROJECT IS BEING DONE AT NIGHT BETWEEN 6:30 PM TO 7:00 AM. NOTE THAT WORK HOURS HAVE BEEN EXTENDED BY AN HOUR AND A HALF. The width restriction has been changed to 11 feet. Loads over 11 feet wide going southbound on I-15 must use Exit 72 to I-86 West to Exit 58, return to I-86 East and continue south at the I-15/I-86 interchange. This bridge and road maintenance operation project on I-15 at milepost 72 will repair the WYE bridges in Pocatello and Chubbuck. Traffic control devices will be removed by 7:00 am each morning. Motorists should expect intermittent lane closures in both the north and southbound directions at the I-15/I-86 Interchange, as well as shoulder closures on the interchange ramps. The 11 foot width restriction is during night time hours of operation only. The entire WYE Bridges project is anticipated to be complete by mid July 2008. Motorists should use extreme caution around crews and equipment.

last updated today at 5:15 PM Mountain Time
 
Interstate
Interstate 15: from Exit 143 - State Highway 33 to Exit 180 - Spenser Road
speed restrictions in force, roadway reduced to one lane because the road is being repaved on weekdays and Saturdays
Comment: Repaving 24 miles of southbound lanes on I-15 from Dubois to Sage Junction and 13 miles of northbound lanes from Dubois to Spencer. Travel will be reduced to one lane in construction zones, and the speed limit will be reduced to 55 mph. Interstate on- and off-ramps will remain open. Work will take place on weekdays and occasionally on Saturdays. Drivers should anticipate changing driving conditions, such as merging traffic, construction vehicles, construction workers and uneven surfaces. The project is scheduled for completion this fall.

last updated June 30
 
ID 16
ID 19
US 20
US
US 20 in both directions: from Cat Creek Summit to Tracy Lane
paving operations, roadway reduced to one lane, speed restrictions in force, truck restrictions in force -- pilot car in operation, look out for flaggers Width limit 14 ' 0 ", Advisory speed limit 55 MPH,. Expect 15 - minute delays.
Comment: A paving operation will limit U.S. 20 to one lane between Cat Creek Summit (milepost 124.6) to the Camas/Elmore County line (milepost 136.4) beginning May 27 until further notice. Lane closures will alternate between east- and west-bound lanes. Pilot car will be utilized during lane closures; watch for flaggers. Expect delays of 15 minutes or more. Speed limit posted at 55 mph in construction zone. There will be a 14-foot width limit in effect. For loads larger than 14 feet, give 24-hour advanced notice to Kenny Lively, 208-320-2967, or Tom Logan, 208-316-0591. Contractor: Central Paving, Terry McEntee, 208-338-0818 James Newhouse 208-338-0818 Traffic Control: Idaho Traffic Safety, Becky Hanover, 208-455-3220

last updated June 24
 
US
US 20: from after State Highway 22; State Highway 33 to before Brunt Street
delays, speed restrictions in force, roadway reduced to one lane because the road is being repaved -- look out for flaggers. Expect 30 - minute delays., Speed limit 45 MPH daily
Comment: Repaving 19 miles of U.S. 20 from the Bonneville County Line to the junction of U.S. 20-26, milepost 283 to 264, beginning at the junction. Motorists can expect 15- to 30-minute delays. Travel will be reduced to one lane, with flaggers directing eastbound and westbound traffic through the work zone. The speed limit in work areas will be reduced to 45 mph. Work will take place weekdays between 7 a.m. and 4:45 p.m., with some work possible on weekends. The project is scheduled for completion in August. Drivers should anticipate unusual driving conditions, such as merging traffic, construction vehicles, flaggers, pilot cars and uneven gravel surfaces.

last updated June 30
 
US
US 20: from Iona Road to before Thornton Road
delays, speed restrictions in force, roadway reduced to one lane, width limit in effect due to road construction work -- look out for flaggers Width limit 12 ' 0 " on weekdays
Comment: Resurfacing 6.4 miles of U.S. 20 from the south Rigby exit 320 to north of Bear World. Expect 15-minute delays. Travel will be reduced to one lane in each direction, with flaggers directing traffic through on- and off-ramps. The speed limit will be reduced to 45 mph, and a width restriction of 12 feet will be in force for commercial vehicles. Work will take place on weekdays between 7 a.m. and 7 p.m., with the project scheduled for completion in August. Drivers should be particularly careful when entering U.S. 20 from county roads and watch for trains at railroad crossings.

last updated June 30
 
ID 21
ID 22
ID 24
ID 25
US 26
US
US 26: from after US Route 26 Business in Ririe to before Birch Creek Road
speed restrictions in force, roadway reduced to one lane because the road is being repaved -- look out for flaggers on Monday, Tuesday, Wednesday and Thursday — until July 8
Comment: Seal coating 10 miles of U.S. 26 between Ririe and Clark Hill. The speed limit will be reduced to 35 mph. The project is scheduled for completion on July 8.

last updated yesterday at 9:13 AM Mountain Time
 
US
US 26: at The Clark Hill Rest Area
rest area closed
Comment: Reconstructing the Clark Hill Rest Area on U.S. 26 east of Ririe (milepost 359). The new rest area is scheduled to open in late July. Temporary rest facilities are not provided.

last updated June 30
 
ID 27
ID 28
ID 29
US 30
US
US 30 in both directions: from after 2000 South Road to River Road
paving operations, single line traffic - alternating directions, roadway reduced to one lane, delays -- pilot car in operation, look out for flaggers. Expect 15 - minute delays., Advisory speed limit 45 MPH on weekdays — until July 22
Comment: U.S. 30 will be reduced to one lane from Bliss (milepost 174.8) to the Malad River Bridge (milepost 177.4) because of a seal coat operation beginning June 23. Be prepared to stop, watch for flaggers and pilot car in operation during working hours 8 a.m. to 5 p.m. Monday through Friday through July 22. Drivers can expect up to 15 minute delays. A 45 mph speed limit will be in effect. Drive slowly, increase following distance to avoid windshield damage caused by rock chips. Contractor: Snake River Construction, 208-733-2287 Traffic control: Amerigo Inc., 208-234-2181

last updated June 23
 
US
US 30 in both directions: from after Crystal Springs Road to before Center Street West
speed restrictions in force, width limit in effect, road construction Width limit 16 ' 0 ", Speed limit 25 MPH on weekdays — until November 30
Comment: US-30, Topaz to Lava Hot Springs. (Referring to the "Topaz" Bridge, east of McCammon.) This major widening project on US-30 from mileposts 365-370 began August 21, 2006 and is expected to be completed by the end of November 2008. A 16 foot width restriction is still in effect from mileposts 366 to 369. The speed limit has been reduced to 25 mph. Motorists should use caution around crews and equipment.

last updated today at 5:14 PM Mountain Time
 
ID 31
ID 32
ID 33
ID 34
SH
SH 34: between Cleveland Road and Maple Grove Road
bridge maintenance operations on Mondays, Tuesdays, Wednesdays and Thursdays — until November 18
Comment: This bridge maintenance operation project is on SH-34 at milepost 28.97 (20 miles north of Preston). Work will be done on the Cleveland Bridge. Contractor is currently working underneath the bridge on the piers. should use caution around crews and equipment.

last updated today at 5:13 PM Mountain Time
 
SH
SH 34 northbound: from after US Route 30; Second Street South to Third East Street
roadway reduced to two lanes, paving operations, road construction, bridge construction, height limit in effect, width limit in effect -- detour in operation Height limit 14 ' 0 ", Width limit 12 ' 0 "
Comment: This project on SH-34 between mileposts 57.8, 3rd Street Overpass, and 58.05 will replace the pavement, curb, gutter, sidewalk, parapit and illumination at the 3rd Street Railroad Bridge in Soda Springs. Traffic has been shifted to the two northbound lanes. DETOUR IN EFFECT IS FOR VEHICLES OVER 12 FEET IN WIDTH, AND LEGAL HEIGHT ONLY. Work is expected to be complete by Fall 2008. Motorists should use caution around crews and equipment.

last updated today at 5:13 PM Mountain Time
 
ID 36
ID 37
ID 38
ID 39
ID 40
ID 41
ID 43
ID 44
ID 45
ID 46
ID 47
ID 48
ID 50
ID 51
SH
SH 51: from after Bureau of Indian Affairs Highway 211 to before Tindall Road
roadway reduced to one lane, road construction, paving operations, delays, speed restrictions in force -- look out for flaggers, pilot car in operation. Expect 15 - minute delays., Speed limit 55 MPH from 08:00am to 08:00pm on weekdays — until July 15
Comment: This project will be from the Duck Valley Reservation (milepost 11.41) to Sheep Creek Road (milepost 19.89). Work will consist of recycling existing plantmix and a portion of the aggregate base layer utilizing the CRABS process and overlaying the entire roadway.

last updated June 25
 
ID 52
ID 53
ID 54
ID 55
SH
SH 55 in both directions: from Interstate 84 to State Highway 44
roadway reduced to one lane, right lane closed, road construction, work in the median -- look out for flaggers — until September 1
Comment: LANE CLOSURES OR RESTRICTIONS WILL BE DONE AT NIGHT FROM 8:00 PM TO 6:00 AM. Expect occasional flaggers during these hours. Work consists of installing conduit, and reconfiguring the signals from Overland Road to State Street. Work that will be done during the day will not affect traffic.

last updated June 26
 
ID 57
ID 58
ID 60
ID 61
ID 62
ID 64
ID 66
ID 67
ID 69
ID 71
ID 72
ID 74
ID 75
SH
SH 75: from after Sullivan Hot Springs Road to before East Fork Road
delays, speed restrictions in force, width limit in effect due to bridge construction work -- look out for flaggers Width limit 12 ' 0 "
Comment: Removing the old Salmon River Bridge 2 miles west of Clayton at milepost 220. The speed limit may be reduced and there may be temporary delays. A width restriction of 12 feet is in force for commercial vehicles.

last updated June 30
 
ID 77
ID 78
ID 79
ID 81
I-84
Interstate
Interstate 84 in both directions: at The Oregon State Line
roadway reduced to one lane, bridge construction, width limit in effect, speed restrictions in force Width limit 12 ' 0 ", Speed limit 55 MPH — until October 31
Comment: The Oregon Department of Transportation will be doing work on the Westbound Bridge this summer. Westbound will be closed, all traffic will be diverted to the eastbound structure while the contractor works on the westbound side. For more information please contact Oregon DOT at 541-889-9115. No loads over 12' wide allowed. The detour will be as follows: Westbound: Take Exit 3 off I-84, to Northbound US-95 to Gayway Junction, turn left onto US-30 to I-84 Oregon Exit 376 westbound entrance ramp. Eastbound: Take Exit 376 off I-84, turn left onto eastbound US-30 to Gayway Junction, turn right onto US-95 South to I-84 Exit 3 westbound entrance ramp .

last updated June 13
 
Interstate
Interstate 84: at The Snake River View Rest Area
rest area closed — until July 15
Comment: The Snake River View Rest Area (located on I-84 at Milepost 1 Eastbound, this is 1 mile from the Oregon/Idaho border) will be closed for building remodel and landscaping. There will be no temporary facilities available and no access will be allowed. The next rest area eastbound is at Blacks Creek located at Milepost 62, east of Boise. Westbound travelers can use the Oregon rest area located just 1 mile from the Idaho/Oregon Border. The rest area is scheduled to be reopened in July 2008

last updated June 24
 
Interstate
Interstate 84: at Exit 29 - Franklin Road
road construction, bridge construction, speed restrictions in force, right lane closed, work in the median, exit ramp closed -- detour in operation Advisory speed limit 55 MPH on weekdays — until September 1
Comment: This work consists of building a new structure over the Interstate at Franklin Road (milepost 29) in Caldwell. I-84 Eastbound Off Ramp will be closed Monday night, June 30th at the Exit 29, Franklin Interchange. The closure will be from 10:00 p.m. to 4:00 a.m. I-84 Eastbound lanes will remain open, but will be reduced to one lane during the ramp closure, from MP 28.7 to MP 29.2. Traffic wishing to use Exit 29 Eastbound will be detoured at Exit 28 and directed to Franklin Road from there.

last updated June 26
 
Interstate
Interstate 84 in both directions: from Exit 36 - Franklin Road to Exit 46 - Eagle Road
roadway reduced to one lane, road construction, speed restrictions in force Speed limit 55 MPH — until July 30, 2010
Comment: Speed Limit is reduced to 55 MPH, 24 hours per day, 7 days a week. Lane restrictions are from 10:00 p.m. to 5:00 a.m. Sunday thru Thursday or 10:00 p.m. to 7:00 a.m. Friday and Saturday. Both left lanes could be closed at the same time during these hours. Construction on these projects are expected to be complete in 2011.

last updated June 10
 
Interstate
Interstate 84 westbound: from after Exit 50 - Overland Road to Exit 54 - Broadway Avenue
road construction, work in the median, speed restrictions in force, roadway reduced to one lane, right lane closed -- look out for flaggers Speed limit 55 MPH — until January 10, 2009
Comment: The speed limit is reduced to 55 mph on I-84 Westbound between Broadway Interchange and Cole Rd Interchange. The shoulder is closed between Vista Interchange and Cole Rd Interchange. The Vista I.C. and Orchard I.C. westbound on-ramps are being controlled by flaggers between the hours of 7:00 a.m. and 7:00 p.m. Motorists are advised to watch for construction vehicles merging onto I-84.

last updated June 26
 
I-84B
Interstate
Interstate 84B: from Bitterbrush Court to South Third West
road construction, paving operations, delays, roadway reduced to one lane -- look out for flaggers, detour in operation, consider using an alternate route. Expect 15 - minute delays. — until July 30
Comment: This project will consists of recycling the existing plantmix and a portion of the aggregate base layer utilizing the CRABS process and constructing urban approaches along American Legion Boulevard starting 8:00 a.m. 6/3/2008 to 6:00 p.m. 7/30/08..

last updated June 25
 
I-86
Interstate
Interstate 86 eastbound: at Exit 40 - Interstate 86 Business
damage to bridge, truck restrictions in force
Comment: Overweight vehicles traveling to State Highway 39 must exit at the West Amercian Falls / Rockland Interchange (mile post 36) instead of East Amercian Falls interchange Bridge (mile post 40). No overweight vehicles on East American Falls Interchange ( I-86 Business Loop).

last updated June 6
 
ID 87
US 89
US
US 89 in both directions: from Home Canyon Road to before Crow Creek Road
delays, speed restrictions in force, bridge construction, road construction, width limit in effect -- look out for flaggers Width limit 12 ' 0 ", Speed limit 25 MPH,. Expect 15 - minute delays.
Comment: This project will realign and widen US-89 Home Canyon to East of Narrows from milepost 30.3 to milepost 31.4, three miles east of Montpelier. A 12 foot width restriction remains in effect. Flagging operations with 15 minute delays should be expected. Motorists should use caution around crew and equipment.

last updated today at 5:14 PM Mountain Time
 
I-90
Interstate
Interstate 90 westbound: from Exit 15 - Sherman Avenue to The Washington State Line
roadway reduced to one lane, speed restrictions in force, short delays due to road construction work Speed limit 45 MPH from 07:00pm to 05:30am on Sundays, Mondays, Tuesdays, Wednesdays and Thursdays
Comment: THIS WORK IS BEING PERFORMED AT NIGHT FROM 7:00PM TO 5:30AM SUN THROUGH FRIDAY AM. One lane traffic will be required and the work zone speed limit is 45MPH. Expect short delays until project completion.

last updated June 18
 
US 91
US 93
US 95
US
US 95: from Parma Road to East McConnell Avenue
roadway reduced to two lanes, road construction, width limit in effect Width limit 12 ' 0 " — until July 10
Comment: This construction project is from milepost 46.60 (Parma Road) to 47.65 (East McConell Avenue in Parma). This project will consist of coldmilling the old roadway and repaving, as well as reconstructing sidewalks, including pedestrian sidewalk ramps, urban approaches and street lighting. For loads wider than 12 feet give 24-hour advance notice to Jon Mensinger at (208) 484-7907 or Cliff Gaylin at 334-8902.

last updated June 5
 
US
US 95: from after 41st Street North to 36th Street North
work in the median daily — until July 21
Comment: Two lanes of travel will be maintained northbound. Southbound will be reduced to one lane on 5/27/08 and remain one lane until approx. 7/21/08.

last updated June 6
 
US
US 95 in both directions: from Fourth Street to Setters Road
long term road construction, speed restrictions in force, bridge construction, delays -- look out for flaggers. Expect 15 - minute delays. from 06:00am to 10:00pm on weekdays — until November 1
Comment: Speed reduced to 50 mph

last updated June 30
 
ID 97
SH
SH 97 in both directions: at Blue Lake Road
bridge construction, roadway reduced to one lane, delays, width limit in effect Width limit 12 ' 0 ",. Expect 15 - minute delays.
Comment: Harrison Bridge project at mile post 69.14 approximately 2 miles north of Harrison. Traffic signals are in use. Depending on the level of the river, there may be a height restriction for boats on the Coeur d'Alene river going under the Harrison bridge.

last updated June 5
 
SH
SH 97 in both directions: between Flicker Lane and Burma Road
bridge construction, width limit in effect Width limit 12 ' 0 "
Comment: Turner Creek Bridge (at milepost 82.21 approximatley thirteen miles north of Harrison) is being replaced. Temporary gravel road surface is in place.

last updated June 5
ID 99
ID 128
ID 162
I-184
ID 200
   

SELECT A REGION:
Text Only


Crash Alert
Roadwork Closures/
Blockages
Lane Closure Section affected

All times reported are in Mountain Time zone.
Go to Trucking tab for commercial vehicle restrictions.
Go to Road Work tab for road work information.